SAP America

SAP America wanted to consolidate their operations onto a single campus. Two existing buildings were acquired and a new 425,000 square foot building was added. The two existing buildings required connectivity and the new building contained a data center that encompassed 65,000 square feet with the capability of supporting 2,700 file servers. This is the location of the corporate headquarters of SAP America and housed demonstration, training and development. The data communications is considered a backbone of the organization and needed to support emerging technologies.

A new service entrance was designed that provided the capability of supporting multiple providers with diverse entrances. The new HQ building scope included: underslab conduit, cable tray and sleeves, approximately 19,000 Unshielded Twisted Pair Category 5e cables, 1,510 strands of fiber optic cable and 3,600 Copper Pairs in the backbone and room layouts. TCI designed the Data Center physical layout and rack elevation designs for all communication infrastructures.

SAP acquired the balance of the campus, which included 12 additional buildings. These were connected to the campus ductbank and renovated as the existing tenant vacated. An additional 5000 feet of ductbank was installed and another 7,400 Unshielded Twisted Pair Category 6 cables, 816 strands of fiber optic cable and 6,800 Copper Pairs in the backbone. Over 600 miles of Unshielded Twisted Pair copper cable was installed.

Tasks included: Development of campus Master Plan with strong consideration for redundancy, Design of the Campus Duct Bank and bid documents, Design of standards compliant Structured Cabling System with Bidding documents, Bid process support, Construction Administration final inspections and project documentation.

The construction costs for communications wiring is in excess of $3 Million.

This project began in 1998 and is still ongoing as tenants vacate as four buildings on the campus are still occupied by tenants. The above description does not include any quantities for these four buildings.




 
 
Copyright © 2006 TCI        
 
louis vuitton outlet Lebron 11 louis vuitton outlet jordan 3 sport blue wolf grey 3s wolf grey 3s kate spade outlet kate spade outlet kate spade outlet michael kors outlet louis vuitton outlet Louis Vuitton Outlet wolf grey 3s kate spade outlet foamposites shooting stars Louis Vuitton Outlet michael kors outlet wolf grey 3s Lebron 11 sport blue 3s Louis Vuitton Outlet louis vuitton outlet louis vuitton outlet michael kors outlet Lebron 11 michael kors outlet kate spade outlet sport blue 6s sport blue 3s Louis Vuitton Outlet michael kors outlet sport blue 6s michael kors outlet Michael Kors Outlet sport blue 6s jordan 6 sport blue sport blue 6s Foamposites michael kors outlet Lebron 11